Organic biological waste 30.000 ton/ year
Storage capacity 1490 m3
Digestion capacity 16375 m3
Process temperature 38°C (mesophilic)
Pasteurization 1 uur at 70°C, 25 m3
Pumping system double
Biogas production 9.000.000 m3/jaar
Utilisation of biogas CHP & gas boiler
Installed combined heat & power 2 MW
Installed power gas boiler 1,2 MW
Elektricity production CHP 18.000 MWe/year
Heat production CHP 27.000 MWth/year
Heat production electrical heaters 7.500 MWth/year
Transformers 2 x 630 kVA, 2 x 2000 kVA
Net cable 6 MW
Dewatering 10 m3/h
Drying process cap. 480.000 m3 air/h
Air washers 1 x 15.000 m3/h, 3 x 80.000 m3/h
Biogas storage capacity 1500 m3
Effluent storage capacity 6000 m3
Fertilizer storage capacity 1500 m3
Mixing agents storage capacity 900 m3
Transport vehicle 1 x tanker (30 ton)
Investment 10.000.000 EURO
Entrepreneur Dhr. Jaak Beelen, CEO
Participation QAT Investments SA